Location: Leighton Buzzard
Company: Marshall Coaches
Sector: Coach Hire Operator
Size: 350m2
Job description:
This job came about from a recommendation from another coach company called Parrys Coaches for whom we did their workshop floor earlier in the summer (photos can be seen on face book)
Glen Marshall explained to us what he required –
The concrete in the existing MOT bay was extremely poor, the previous coating was worn and had almost disappeared.
We used a lighter grinder than the normal (a htc 500) instead of the omega 700 we normally use, to keep grind marks to a minimum with a soft substrate.
Glen decided to use a dark grey colour (similar to the one used on the previous Parrys Coaches job) followed by yellow and black demarcation lining around the two brake testers.